The recent upgrade to the half basketball court at John Miller Reserve in Adelaide’s Somerton Park commenced with pressure washing the asphalt surface. The Surfacing Contractors Australia team then proceeded to supply and install the GreenSet Cushion System across the 200m2 area using GreenSet Australian Open Velocity Blue for the surrounds and the key within the lane lines, then Laykold Arctic for the interior of the three-point line. White line marking was then applied to complete the project.
The following music was used for this media project:
Music: Mafia by Sascha Ende
Free download:
License (CC BY 4.0):
Artist website:
This article was gathered automatically by our news bot. We help YouTubers by driving traffic to them for free. The featured image in this article is the thumbnail of the embedded video. Thank you for visiting Win Big Sports Network and wbsnsports.com. For more sports, news, and entertainment, follow us on Twitter @WBSNsports or like our page on Facebook.
#Sports #Video #Highlights